Project:
Client:
Consultant:
Key Facts:
|
Primelife Retirement Village Ground Anchors
Primelife
Babbage Consultants
 |
19No. double corrosion protected (permanent) multi-strand anchors (UTS 552kN), 10m (including steel whalers) and 1No. full scale sacrificial proving trial anchors (UTS 920kN) |
 |
Full design and construct service |
|
|
 |
|
Project:
Client:
Consultant:
Key Facts:
|
Polarcold Stores Post-tensioned Floor Slabs
Lund South
Peter Swann
 |
Design and construct post-tensioning for 1No post-tensioned structural slab (750sq.m) to deal with up to 60mm differential settlement and 2No. post-tensioned wear slabs (370sq.m each) |
 |
Full design and construct service |
|
|
 |
|
Project:
Client:
Consultant:
Key Facts:
|
Kumeu No 1 Bridge External Post-tensioning
Conspec Construction
Opus
 |
16No external post-tensioned cables (8m long) with tendons greased and sheathed in-house using specialist machine |
 |
Tendons installed and grouted within HDPE pipe |
|
|
 |
|
Project:
Client:
Consultant:
Key Facts:
|
Auckland Airport Power Cable Grouting
McKenzie & Parma
Beca
 |
2,600 lineal metres of insulation grouting to power cable |
 |
40cu.m cement-bentonite grouting specifically formulated to meet thermal resistivity requirements |
|
|
 |
|
Project:
Client:
Consultant:
Key Facts:
|
Carlaw Park Retaining Wall Anchors
Haydn & Rollett
Dodd Civil
 |
72No. double corrosion protected (permanent) multi-strand anchors (UTS 552kN to 2,208kN), 10m |
 |
Full design and construct service |
|